This contractor pricing guide gives you a price list you can keep in the truck, send to a customer who asks, and quote from on the phone. The sheet covers the small and repeat work a general contractor does every month: drywall, doors, windows, trim, tile, decks, vanities, cabinets, fences, paint and haul-away. Big remodels and new builds stay on an estimate, and the sheet says so.
The page and its files are general information, not legal advice. Laws differ by state and change, so check your own state’s current rules before you use the form. Terms for free content.
What goes on each line of the price list
A state name in parentheses marks a line that a text quoted further down speaks to. “Ours” marks a line we put there because the sheet works better with it.
| Field | You write | Why it is there |
|---|---|---|
| Company and license | ||
| Company name, phone, website or email | Typed in, or your logo in the top box | Whoever holds the sheet a month from now can still reach you (ours). |
| License or registration number, license class | The number your state gave you, and the class it covers | California and Florida texts ask for the number in advertising and offers of service; the states section shows which paper each speaks of (California, Florida). |
| Licensing board | Name, phone and website | A customer can see who licenses you (ours). |
| Standard jobs | ||
| Drywall, doors and windows | Patch a small hole, a hung and finished sheet, an interior door, an exterior door, one window | The calls that come in every week get a number you can say without a visit (ours). |
| Per-foot and per-square-foot lines | Trim, wall framing, tile floor, deck boards | Work that grows with the room is priced by the unit, so a bigger room is the same math (ours). |
| Fixtures and outside work | Vanity, cabinet box, fence section, one room of paint, a load of demolition and haul-away | Each one has a clear start and end, which is what makes a set price safe (ours). |
| Jobs of your own | Job, what is included, your price, notes | Eight rows for your own common jobs, with a notes column for limits (ours). |
| Rates, fees and markups | ||
| Estimate or site visit fee | The fee, and whether it comes off the job if they book | A customer knows before you drive out (ours). |
| Hourly rates and day rate | One worker, a crew of two, a crew for a day | Anything not on the list still has a price a customer can read (ours). |
| Minimum charge | The least you bill for a visit | A 20 minute job still costs you the drive and the setup (ours). |
| Markup on materials and on subcontracted work | A percent for each | Written once, so every estimate you send adds the same (ours). |
| Fee on larger projects | A percent of cost or a fixed fee | The way you charge when you run the whole job and the subs (ours). |
| Dumpster or disposal fee | Your price per container or per load | Dump fees are real money and easy to forget on a quote (ours). |
| Terms | ||
| The printed note | Already on the form | Hidden damage, a change of scope or a custom design moves the job to a written estimate before work goes on (ours). |
| Prices good until, payment methods | A date, and card, check or other | Material prices move, and payment is agreed before work starts (ours). |
| Workmanship warranty, permit fees | What you cover and for how long; who pulls permits and the fee | Both are asked after the job when they are not in writing before it (ours). |
| Materials chosen by, price changes if | You or the customer; a cause you can name | A customer who picks a pricier tile knows the line price changes with it (ours). |
Contractor pricing guide: how to fill in the numbers
We give no market price for any line. A door hung in Phoenix and one hung in Boston carry different labor, rent and insurance behind them, so the only number that fits your sheet is the one your books give you.
Your cost for one hour of work
Start with what you pay a worker for an hour. Then add what that hour drags in behind it: payroll taxes, workers’ comp and liability insurance, the truck and fuel, tools, the office, and the hours you spend on calls, quotes and invoices that nobody pays for. Total a year of those costs and divide by the hours your crew really bills, not the hours they are on the clock. That figure is the floor. A price below it loses money on every job, however busy you are.
Markup and margin are two different numbers
Buildertrend, the construction software company, puts it plainly in its pricing guide: “Markup is the amount added to your costs to determine the final selling price, while profit margin is the percentage of revenue that remains after all expenses have been paid.” The gap catches people. Buildxact, another estimating software maker, notes in its markup article that “a 20% markup produces only a 16.7% margin.” Both read November 23, 2026. So if you want a set margin left after costs, work out the markup from that margin, and write the markup on the sheet.
Time a job three or four times, then fix the price
For each standard line, pull your last few times doing it. Note the hours, the materials and the drive, and take the usual job, not the best one. Hours times your hourly cost, plus materials, plus your markup, gives the line price. For a per-foot line, divide the whole job by its feet. Then round to a number you can say out loud on a call.
Where a set price stops
A list works for jobs with a clear start and end. Once a wall is open and you find rot, or the customer wants a design you have not built before, the list no longer fits. The note on the form says that job gets a written estimate first. Our contractor estimate template is the sheet for that, and how to bid construction jobs covers the visit and the bid.
Keep it current
Buildertrend’s same guide says “Many builders update pricing databases monthly or quarterly.” Pick a date for the “Prices good until” line, and when it comes, rerun the numbers against last quarter’s invoices.
A contractor’s price list and state law: what we found in California, Texas, Florida and New York
Each quote below is copied word for word from the text named, and each says which paper it speaks of. No text we read names a price list. Whether a given price list counts as advertising or an offer of services is for the state’s board, not for this page. If you work elsewhere, or in a town with its own rules, read the wording at the source before you rely on the form.
California, Business and Professions Code
Business and Professions Code section 7030.5 applies to every licensee of the Contractors State License Board. It speaks of contracts, bids and advertising: “Every person licensed pursuant to this chapter shall include his license number in: (a) all construction contracts; (b) subcontracts and calls for bid; and (c) all forms of advertising, as prescribed by the registrar of contractors, used by such a person.” The registrar’s rule on forms of advertising was not read.
Section 7027.1 applies to any advertising for construction work covered by the contractor chapter. Its words are from the state’s own page, checked there November 23, 2026. It speaks of advertising: “(a) It is a misdemeanor for any person to advertise for construction or work of improvement covered by this chapter unless that person holds a valid license under this chapter in the classification so advertised, except that a licensed building or engineering contractor may advertise as a general contractor.” Section 7027.2 applies when an unlicensed person advertises work under $1,000; read it there.
Texas, Business and Commerce Code
We found and read no statewide rule on a general contractor’s price list in Texas. Business and Commerce Code section 27.02 applies to a contract for goods or services reasonably expected to be paid at least partly from a property insurance claim, with a contract price of $1,000 or more. Its subsection (c) makes it an offense to advertise or promise to pay, waive or rebate the deductible without the insurer’s consent; we do not quote it here, so read it there. Electricians, plumbers and air conditioning contractors have their own advertising rules in Texas: rule 73.51, rule 367.10 and rule 75.71. Check the state’s and your town’s own rules.
Florida, chapter 489 and rule 61G4-12.011
Florida statute 489.119(5) applies when a contractor registered or certified under Part I of chapter 489 makes an offer, proposal, bid, contract or advertisement. It says “The registration or certification number of each contractor shall appear in each offer of services, business proposal, bid, contract, or advertisement, regardless of medium, as defined by board rule, used by that contractor or business organization in the practice of contracting.” The license number line on the form is there for that number.
The board rule it points to, rule 61G4-12.011(3), says which media count as advertising: “The terms “advertise” and “advertises” shall apply to business cards, business proposals, contracts, construction site signs, all newspapers, airwave transmission (other than internal company communications), any electronic media including Internet sites, phone directory, and other media including handbills, billboards, flyers, shopping and service guides (coupon offerings), magazines (including trade associations publications), classified advertisements, manufacturer’s “authorized dealer” listings, and signs on vehicles.” The rule does not name a price list. Statute 489.127 applies when anyone advertises as available to act as a contractor, or acts as one, without being registered or certified; read it there.
New York, General Business Law
We found and read no statewide New York rule on a contractor’s price list or advertising. The texts we read, General Business Law section 770 and section 771, speak of the signed home improvement contract, and this form does not carry the notices and headings they ask for. Check the state’s and your town’s own rules.
When a caller asks your price and you are mid-job
The sheet only helps when someone is there to read from it. A homeowner rings to ask what a door costs while you are holding a sheet of drywall overhead, gets voicemail, and calls the next contractor. What missed calls cost puts a number on that, and missed call text back for contractors has texts you can send yourself.
When you cannot pick up, SvarKlar texts the caller within seconds. It quotes only from your own price list, and only if you want that, so the numbers on this sheet are the ones a caller sees. A job past the list gets its details taken and passed to you for the estimate. What an AI receptionist costs lays out the options, and our contractor answering service guide shows the rest.
Your prices start from one number: what an hour of your crew’s work costs you, with a markup you worked back from the margin you want. Download the sheet and write that hourly cost in the corner before you fill a single line.
Want to see how SvarKlar would answer a caller who asks your price? Book a call or see how the service works.